Easy carried out the revitalization and modernization of the Société Générale floor in the São Luís Gonzaga building, in São Paulo, with more than 2,000 sqm. The bank kept occupying the space throughout the project. Easy was invited by PITA Arquitetura and split the work into six phases of about 20 days each, for a total of more than 120 days, in 2022.
What was the scope of the Société Générale project?
The bank already occupied the floor and decided on a major revitalization, updating and modernizing the space. The project renovated:
- receptions;
- lounge areas;
- pantry;
- restrooms.
It also included new wall coverings and carpets, landscaping and furniture.
What was the main challenge?
Doing all of this with the client occupying the floor. The bank’s operations could not stop.
How was the project organized?
Easy split the work into six phases, each lasting about 20 days. Some phases were slightly longer, and the project totaled more than 120 days.
What was the contracting model?
Easy was invited by PITA Arquitetura, the author of the design, to build the project, delivered Turnkey.
What was the result?
The project was delivered in 2022, without stopping the bank’s operations, to the client’s complete satisfaction.
See other projects in the Corporate segment.
Frequently asked questions
- What was the area of the Société Générale project?
- More than 2,000 sqm, on one floor.
- Where is the office?
- In the São Luís Gonzaga building, in São Paulo.
- Did the bank keep operating during the project?
- Yes. The work was done in six phases, with the bank occupying the floor the whole time.
- How long did the project take?
- More than 120 days, in six phases of about 20 days each, in 2022.
- What was renovated?
- Receptions, lounge areas, pantry and restrooms, with new wall coverings and carpets, landscaping and furniture.