Samsung SDS Cello
Samsung SDS Cello
- Client
- Samsung SDS Cello
- Location
- Morumbi Corporate Diamond Tower, São Paulo, SP
Easy built a 2,051 sqm floor for Samsung SDS Cello in the Morumbi Corporate Diamond Tower, in São Paulo, in 2018. Samsung SDS Cello is the logistics and technology arm that manages the Samsung group’s supply chain. The project followed Samsung’s global finish and documentation standards and was delivered in 90 days, as a construction project delivered Turnkey.
What was the scope of the Samsung SDS Cello project?
Easy fitted out a 2,051 sqm floor in the Morumbi Corporate Diamond Tower for Samsung SDS Cello, the group’s logistics and technology arm, responsible for managing the group’s supply chain.
What was the main challenge?
Following the Samsung standard in everything:
- finishes within the brand’s standard;
- all of Samsung’s documentation requirements and global standards.
All of this within 90 days of construction.
What was the contracting model?
The design was by MB Arquitetura (Marcos Benjamin Arquitetura), which had already been hired by Samsung. The client then opened a bid for the construction, and Easy won. Delivery was Turnkey.
What was the result?
The project was delivered within the 90-day deadline, in 2018, with a satisfied client.
See other projects in the Corporate segment.
Frequently asked questions
- What was the area of the Samsung SDS Cello project?
- 2,051 sqm, on one floor.
- Where is the office?
- In the Morumbi Corporate Diamond Tower, in São Paulo.
- How long did the project take?
- 90 days, in 2018.
- Who did the architectural design?
- MB Arquitetura (Marcos Benjamin Arquitetura). Easy won the bid for the construction.
- What was Samsung's main requirement?
- Following the brand’s global standards, in the finishes and in all the project documentation.
Samsung SDS Cello