Easy built the MAC store in Terminal 3 of Guarulhos International Airport, with about 100 sqm, as part of the Dufry package of projects. The project took about 60 days, in 2014, following MAC’s global standard: lighting, makeup counters, mirrors and air conditioning. The design came from the brand itself, executed as a Turnkey.
What was the scope of the MAC project?
Easy built the MAC store in Terminal 3 at Guarulhos, with about 100 sqm, to the brand’s global standard:
- lighting designed for makeup;
- makeup counters;
- mirrors;
- air conditioning.
What was the main challenge?
The logistics of a project on the airside of the airport. The area is past the Federal Police checkpoint, and the entire project depended on approved documentation.
Crews, materials and tools came in from a cleared list. Any tool that was not on the list required a new clearance request, with a 48-hour wait. For that reason, the planning had to anticipate every item before the crew went in.
This airport know-how led Easy to take on several simultaneous projects in Terminal 3 in 2014.
What was the contracting model?
The design came from MAC itself. Easy handled the construction, with Turnkey delivery, within the Dufry package of stores at the airport.
What was the outcome of the project?
The store was delivered on schedule in about 60 days, in 2014, with a satisfied client.
MAC is part of Easy’s set of projects for Dufry at Guarulhos, which includes the roughly 4,500 sqm store in Terminal 3, the Terminal 2 departures project and stores for brands such as Luxottica, Ferragamo and Gap.
See other projects in the Commercial segment.
Frequently asked questions
- Where is the store?
- In Terminal 3 of Guarulhos International Airport.
- What was the area of the project?
- About 100 sqm.
- How long did the project take?
- About 60 days, in 2014.
- What does the store have from the MAC standard?
- Lighting, makeup counters, mirrors and air conditioning to the brand’s global standard, with a design by MAC itself.
- What are the logistics of a project on the airside of the airport?
- The entire project depends on documentation approved by the Federal Police. A tool not on the cleared list requires a new request, with a 48-hour wait.