Easy renovated the corporate floor of the finance department of Caterpillar, the American machinery and equipment multinational, in the Avenida Chucri Zaidan area, in São Paulo. The project refitted the entire floor with the client occupying the space, in phases, without shutting off power or air conditioning at any point. Delivery was Turnkey.
The challenge: renovating the floor without moving anyone off it
Caterpillar’s finance team kept working on the floor throughout the renovation. The work had to happen around the people, without disrupting their routine.
The strictest requirement was technical. Power and air conditioning could not be shut off at any point. In a refit that reaches the entire floor, this means planning each intervention in the installations so that no outage reaches the occupied area.
Occupied-office renovation in São Paulo
The solution was to split the project into phases. Each phase tackled one part of the floor while the rest remained in use. Managing this coexistence had three fronts:
- sealing off work areas with hoarding;
- constant cleaning of the areas handed back;
- sequencing interventions in power and air conditioning without interrupting supply.
As a result, the work moved across the floor without interfering with the client’s day-to-day operations.
Schedule and method: construction with a project manager
This was a construction project. The design was not part of a partnership between Easy and the architecture firm, and execution was overseen by a project manager hired by the client.
Working with a project manager means answering to external control of schedule, quality and safety throughout the project. Easy carried out the phases within this oversight.
Result
The project was delivered successfully, without interrupting the operation of Caterpillar’s finance department. After it, Caterpillar became a repeat client of Easy. See other projects in the Corporate segment.
Frequently asked questions
- Can you renovate an entire floor while the team keeps working on it?
- Yes. At Caterpillar, the project was split into phases, with areas sealed off by hoarding and constant cleaning, so the team could keep working on the same floor.
- How do you keep power and air conditioning running during a renovation?
- By planning each phase so that no shutdown reached the occupied area. At Caterpillar, the floor’s power and air conditioning could not be interrupted at any point during the project.
- What was the contracting model?
- Construction contract. The design was developed outside a partnership with Easy, and the project was carried out under the oversight of a project manager hired by the client. Delivery was Turnkey.
- Did Caterpillar hire Easy again?
- Yes. After this project, Caterpillar became a repeat client of Easy. Delivery was Turnkey.