New Office: Moving for the Better Can Be Easier and More Economical Than You Think

· 2 min

See Easy's working method that turns any renovation or new workspace implementation into a logical, transparent process that stays on schedule and on budget.

The real estate market, particularly the office sector, currently presents interesting opportunities. São Paulo and other major Brazilian capitals have an expressive volume of new corporate spaces, fueling what Easy calls the “musical chairs”: companies that move in order to simultaneously reduce expenses and gain prestige in their facilities.

Despite these advantages, resistance still exists. Concerns revolve around cost-benefit, budget overruns, construction timelines, supplier coordination and quality assurance.

Easy’s methodology structures the workspace renovation or implementation process into distinct, transparent stages:

Financial Analysis (optional stage)

This phase identifies inefficiencies in the current office space, focusing on energy consumption, building performance, technology integration and maintenance systems, aiming to reduce operating costs.

Deliverable: an analysis report with findings and implementation guidelines.

Survey

Information-gathering stage on the client’s needs program: furniture, filing and equipment volume, as well as the conditions of the existing property, including metrics and infrastructure.

Deliverable: a diagnosis of the current situation and definition of needs.

Initial Studies / Test Fit

Preliminary studies lay out workstations, files, IT equipment and finish options, evaluating the compatibility and functionality of the furniture.

Deliverable: design alternatives, budgets and finish and furniture suggestions.

Design

Final, complete layouts and technical documentation that establish execution standards and the criteria for supplier bidding.

Deliverable: final project documentation and supplier selection criteria.

Corporate Construction and Management

Execution monitoring to ensure adherence to the design, schedule and budget.

Deliverable: construction coordination and control reports.

Corporate Space Handover

Technical support during the move, including documentation and final adjustments.

Deliverable: a move-support team and formal completion of the project.