17 years delivering projects for multinationals. Here's what I've learned. And what I'm still learning.
· 3 min
By Cauí Torres, founder of Easy: lessons from 17 years delivering corporate projects for multinationals like J&T, Mattel, DHL, Mercedes and NielsenIQ.

By Cauí Torres, founder of Easy
There’s a scene that keeps repeating itself.
The client arrives with a preliminary layout, an impossible deadline, and the pressure to hand over the old office before closing the new contract. They don’t have time to follow the standard process. And that’s exactly the moment when the choice of construction model determines whether the project happens or turns into a problem.
I learned this in practice. Delivering projects for J&T, Mattel, DHL, Mercedes, NielsenIQ and other clients who don’t appear on this list.
Two models. Each one in the right place.
In the traditional DBB process, design, bidding and construction are contracted separately. The client hires a management firm, runs a design competition, chooses the architecture, runs another competition for the contractor, and then the work begins. It’s a solid, tested model that works very well when there’s an internal structure to manage multiple stakeholders and, above all, when there’s time.
Easy executes this model. And we recommend it when it makes sense.
But a good part of our clients arrive in a different situation: an expiring lease, a product launch that can’t wait, a restructuring with a fixed date. For these cases, contracting design and construction separately usually isn’t the best choice. Not because it’s inferior, but because it was designed for those who have time. And time is exactly what’s missing.
What D&B solves, and what we’ve learned doing it
Design & Build isn’t just about bringing design and construction under the same contract. That part is relatively simple.
What really changes is who stands in the middle of the road.
In Easy’s D&B model, the client talks to one person. One. They don’t talk to the architecture firm separately, they don’t talk to the contractor separately. They talk to Easy, and Easy sorts it out with everyone else.
For a company with a lean operation in Brazil, without a dedicated infrastructure team, this isn’t a convenience. It’s the difference between a project that happens and a project that stalls.
Three things practice has taught me
First: choosing the architecture partner is strategic, not aesthetic.
Easy doesn’t have in-house architecture by choice. No company can maintain an internal structure that serves every client profile. We’ve built a network of corporate architecture partners over the years, and for each project we assess which profile best serves that specific client. We call this curation. It’s different from outsourcing.
Second: an internal PMO isn’t bureaucracy. It’s what makes the deadline happen.
Construction planning is the midfield nobody wants to pay for, until the project falls behind. When you have an internal planning structure within the contractor, you eliminate the finger-pointing between parties. The problem surfaces before it becomes a crisis.
Third: knowing when not to use D&B is as important as knowing when to use it.
Companies with a robust infrastructure structure, a dedicated team and a comfortable deadline are often better served by the traditional model. Our role isn’t to sell a model. It’s to understand the client’s need and guide them to the right choice, even if that choice gives us more work.
That’s what practice keeps teaching me, often in the hardest way.
It’s not in the manuals. It’s on the construction site when the deadline tightens, the client needs an answer, and we need to rise to the moment.
17 years have taught me to ask the right question before any proposal. If you’re planning an office expansion or move, start there. Tell me the scenario and I’ll tell you directly which model makes the most sense for your case.